Road and pavement improvements begin at Lurgybrack
Work is under away today on road and pavements at Lurgybrack. Traffic controlling measured are place with work expected to take six weeks. Local Cllr Dessie Larkin says that some parts of the road and footpath were falling apart. And he said these works today are much needed: [podcast]http://www.highlandradio.com/wp-content/uploads/2011/10/desl1pm.mp3[/podcast]
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed